您好,欢迎来到中国企业库   [请登陆]  [免费注册]
小程序  
APP  
微信公众号  
手机版  
 [ 免责声明 ]     [ 举报 ]
企业库免费B2B网站
搜产品 搜企业
客服电话:400-000-8722
企业库首页>资讯
行业

Wuhai Municipal People's Government on the comprehensive ...

作者:企业资讯策划团队 来源:rwfb 发布时间:2010-05-23 浏览:221

In order to further control air pollution, protect the people to fight a tough fight air pollution. On governance tasks and measures for now notice are as follows:

one to govern the scope of

comprehensive environmental control area (haibowan things to the district town and its surrounding community, within 6 km north-south and uda, Hainan the existing built-up area) and the citys key industrial pollution sources.

2, governance tasks and measures for

1, in the control area of all residents in households in non-burning bituminous coal, you must specify the coal burning, promote the use of gas, electricity and other clean energy.

2, in the control area of all food service, cafeteria big hearths must implement gas, fuel oil, electricity, right to the concentration of residential areas, mixed residential dining areas, main streets on both sides of the food service industry to carry out fumes and noise governance, in the end of September 2006 be completed before the deadline.

3, to ban all within the control area coal-fired stove. In the gas, natural gas pipe network coverage area of the bath furnace gas must be achieved. Outside the coverage area, you must use the specified coal. All heating boilers, industrial boilers to achieve a stable discharge standards, no dust removal facilities, emissions from the boiler heating boilers and excessive Jinshao bituminous coal in favor of the designated coal to encourage the transformation of the oil, gas, electricity installations. Fireman must be certificates, norms fireman operation.

4, where the central heating within the region, are not allowed on the new coal-fired boilers, central heating does not have the right conditions for the region, according to the actual situation may be new on the larger heating boilers, the implementation of a regional joint piece heating. Encouraged to spare a large-scale industrial heating boilers and heating boilers heating paid to the surrounding residents. Where the disabled heating boilers, industrial boilers from the disabled shall within 6 months from the date of removal of the boiler chimney, the former coal storage site should be flat green.

5, continue to implement bituminous coal into the city Zhunyun management system, environmental protection department issued to non-bituminous Zhunyun Zheng transport vehicles into the city is strictly prohibited. The clean energy supply market is strictly prohibited sales of more than 0.5% sulfur content, ash content greater than 15% of the specified coal.

6, prohibiting any unit or individual burning straw, fallen leaves or other substances produce smoke and dust, the burning of asphalt, rubber, plastics, leather, oil, garbage, and other toxic substances harmful and malodorous gases.

7, to enhance building construction sites, road construction, transport vehicles and coal dust management field. Open pile of coal, coal cinder and so easy to produce dust of the items, must take effective measures to prevent and control pollution. Construction unit engaged in road construction, construction job, must be easy to produce dust will be closed stacking of materials, dust control measures taken by the transport vehicles to transport the material easy to produce dust during transportation to be closed or take sheeting to cover protective measures, to prevent dust pollution.

8, to enhance motor vehicle tail gas treatment, transport, public security departments to prohibit the tail gas of motor vehicles driven on the road polluting. Monitoring distribution of qualified vehicles, of vehicles, traffic, public security departments are not annual review, listing and transfer.

9, has been in operation for power companies do not fulfill the anti-tobacco dust to dust the end of 2006 before the deadline for the completion of facility improvement, and the dust on-line monitoring devices, to achieve discharge standards, shall be required before the end of 2007 on the desulphurization treatment facilities and sulfur dioxide Online monitoring devices to achieve compliance sulfur dioxide emissions, failure to comply with discharge limits on the schedule of power enterprises to stop production management. New, change, expansion of the generating units, to be simultaneously supporting the building of facilities for desulphurization and dust and sulfur dioxide, smoke and dust on-line monitoring devices, to achieve discharge standards. High load to industrial pollution control facilities to ensure 24-hour operation, the electric power sector companies want to be able to produce high load and treatment facilities, electric power meters transformation. Blast furnace must be installed anti-hair box, is strictly prohibited the use of diffuse emission hole-free organization. Other polluting enterprises in industrial furnace or generate dust pollution in the construction section must be installed or a water bath-style dust bag dust collector device met the requirement. Right treatment facilities can not operate normally or idle pollution control facilities, excessive emissions of pollutants enterprises to stop production rectification.

10. continue to implement air pollution control system of the first responsible person. District governments, departments to set up air pollution control organizations, to develop urban air pollution control implementation plan developed and implemented as soon as possible eliminate backward production capacity, plans to accelerate the pace of backward production capacity of elimination. Towns, street offices and neighborhood committees and village committees should earnestly strengthen supervision and inspection of the residents to use coal, coal management and technical supervision departments should strengthen the price of clean energy supply market, the supervision and inspection, public security, the citys comprehensive law enforcement departments to do a good job pulling transportation of bituminous coal dust and easy to cause secondary regulation of the transport vehicles, municipal Industrial and Commercial Bureau to do a good job catering services to change the oil, changing gas, electricity work, did not seek to implement the revocation of business licenses, environmental protection and departments should step up and inspection of industrial pollution sources to ensure the discharge standards.

11, for violating the provisions of the units and individuals, the regulatory authorities and law enforcement officers will be in accordance with relevant laws, regulations, and the relevant notice be punished.

12, the notice from the release date of implementation.

乌海市人民政府关于城市空气污染综合治理工作的通知

为了进一步控制空气污染,保护人民的身体和精神健康,市政府决定继续组织实施“蓝天绿色工程”,打一场艰苦的战斗空气污染情况。关于治理任务和措施的通知,目前如下:

一个管辖范围

综合环境控制区(海勃湾东西区镇及其周围的社区内6公里,南北和宇,海南现有的建成区),市重点工业污染源。

2,治理任务和措施,

1,在家庭,在非控制区所有居民烧烟煤,您必须指定燃烧煤炭,促进天然气,电力和其他使用清洁能源。

2,在所有餐饮业,食堂大灶必须实现天然气,燃料油,电力,控制面积有权集中居住区,商住就餐区,对饮食服务行业主要街道两侧开展油烟和噪声治理2006年9月底前完成的{zh1}期限。

3,禁止在控制区燃煤所有燃煤炉灶。在天然气管网的浴炉煤气覆盖面积必须实现天然气。覆盖范围以外的,必须使用指定的煤炭。所有采暖锅炉,工业锅炉,实现稳定的排放标准,没有除尘设施,在指定的燃煤排放的青睐,以鼓励石油,天然气,电力设施改造的锅炉供热锅炉和过度哨烟煤。消防员必须证书,规范消防员操作。

4,在区域内的集中供热,是不是在允许新的燃煤锅炉,中央供暖不具有本地区合适的条件,根据实际情况可能会在新的更大的供热锅炉,一个区域联合一块加热的执行情况。鼓励腾出一个大规模的工业加热锅炉和供暖锅炉支付给周围居民供热。凡残疾人供热锅炉,从残疾人工业锅炉应在从锅炉烟囱搬迁期限6个月,前煤炭贮存场所应平整绿化。

5,继续贯彻到城市Zhunyun管理系统烟煤,环保部门出具的非到城市沥青Zhunyun郑运输车辆是严格禁止的。干净的能源供应市场,严禁大于15%的规定煤炭超过0.5%,硫含量,灰分含量的销售。

六,禁止任何单位和个人焚烧秸秆,落叶或其他物质产生烟雾和灰尘,沥青,橡胶,塑料燃烧,皮革,石油,垃圾及其他有毒有害物质和恶臭气体。

7,以加强建筑地盘,道路建设,运输车辆,煤尘管理领域。煤炭,煤渣等易产生粉尘的项目公开赛桩,必须采取有效措施,防止和控制污染。建设单位从事道路建设,建设工作,必须容易产生灰尘将会封闭的物料,粉尘控制措施采取的运输车辆运输物料的易产生粉尘在运送被关闭或采取薄膜覆盖保护措施,以防止粉尘污染。

8,加强机动车尾气治理,交通,公安部门,禁止在污染的道路上行驶机动车辆尾气。监测合格的车辆分配,“车辆排放标准证书”的监测车,没有在现场或限期治理,没有“认证的汽车废气排放车辆,交通,公安部门”不是年度审查,上市和转移。

9,已对电力公司的运作不符合反烟草尘尘在未完成的设施改善期限到2006年年底,和关于粉尘在线监测装置,以达到排放标准,均须在2007年的脱硫处理设施和监测装置,实现二氧化硫排放情况,没有与电力企业的时间表排放限值遵守停止生产管理二氧化硫在线结束。新的变化,发电机组的扩大,将同时支持脱硫设施和粉尘,二氧化硫,烟尘建设在线监测装置,以达到排放标准。高负荷的工业污染治理设施,以确保24小时运作,电力部门的公司希望能够生产高负荷和处理设施,电表改造。高炉必须安装防头发中,是严禁排放孔弥漫性使用无组织。其他污染企业或工业炉产生扬尘污染的建筑部分,必须安装或水浴式除尘袋除尘器设备的规定。正确的处理设施不能正常运行或闲置污染防治设施,污染物排放过量的企业停产整顿。

10。继续实施空气污染的{dy}责任人的控制系统。区政府,各部门设立空气污染控制的组织,开展城市空气污染控制计划,制定和实施,尽快淘汰落后生产能力,计划,加快淘汰落后生产能力的步伐推行。镇,街道办事处,居委会,村委会要切实加强监督检查的居民使用煤炭,煤炭管理和技术监督部门要加强对清洁能源供应市场价格,监督检查,公安,城市综合执法部门做好退出烟煤灰尘和便捷的运输服务事业的运输车辆,市工商局二次调节做好饮食服务工作,改变石油,改变天然气,电力工作,不寻求执行的营业执照,环保部门撤销应加强与工业污染源检查,以确保排放标准。

11,对违反的单位和个人,监管当局和执法人员的规定,将依照有关法律,法规的规定,以及“蓝天绿色工程”的有关通知,受到惩罚。

12,从发布之日实施的通知。
06.1.28

Tags: , , ,

郑重声明:资讯 【Wuhai Municipal People's Government on the comprehensive ...】由 企业资讯策划团队 发布,版权归原作者及其所在单位,其原创性以及文中陈述文字和内容未经(企业库www.qiyeku.com)证实,请读者仅作参考,并请自行核实相关内容。若本文有侵犯到您的版权, 请你提供相关证明及申请并与我们联系(qiyeku # qq.com)或【在线投诉】,我们审核后将会尽快处理。
会员咨询QQ群:902340051 入群验证:企业库会员咨询.
免费注册只需30秒,立刻尊享
免费开通旗舰型网络商铺
免费发布无限量供求信息
每天查看30万求购信息